Financing and competitiveness in copper mining
DOI:
https://doi.org/10.21701/bolgeomin.130.1.006Keywords:
copper, mineral economy, metal financing, metals supplyAbstract
The analysis of an investment project in mining requires not only the physical or geological knowledge of the project (the first phase of the project) but also the economic conditions where it operates. The price volatility of metals prices makes the rigour of the analysis fundamental, and both physical and geological conditions should be included in the analysis that will characterize the possibilities of technological application, as well as a very careful study of the economic-financial variables that characterize the competitive position of the project and the mining company. As an example, we present an investment case in one of the main world copper producers, Antofagasta PLC, and describe the bases of the analysis carried out in order to achieve efficient results.
Downloads
References
Antofagasta PLC. 2017. www.antofagasta.co.uk
Bloomberg, 2017. Electric-Car Revolution Shakes Up the Biggest Metals Market. https://www.bloomberg.com/news/articles/2017-08-02/electric-car-revolution-is-shaking-up-the-biggest-metals-markets
De la Torre, L., Espi J.A. 2017. Ciclo de Conferencias GERRM, Las razones geológicas de la actual minería del cobre (en publicación en este número BGM)
DeYoung J.H. 1981.The Lasky cumulative tonnage-grade relationship; a reexamination. Economic Geology, 76 (5): 1067-1080. https://doi.org/10.2113/gsecongeo.76.5.1067
E&MJ 2014, E&MJ's Annual Survey of Global Metal-mining Investment. January 2014. https://www.e-mj.com/features/e-mj-s-annual-survey-of-global-metal-mining-investment/
Ivanhoe Mine, 2018. Presentation https://www.ivanhoemines.com/investors/presentations/
Larson, V., Ericsson M. 2014. Annual Survey of Global Metal-mining Investment, Engineering Mining Journal.
World Bank. 2017. Commodities Market Outlook, Oct.2017
Wood Mackenzie. 2014. Metal Costs Benchmarking 2014, Q4.
LME. 2017. https://www.lme.com
Manteca, J.I. 1993. De la modelización del yacimiento a la producción mineral diaria. Universidad Complutense de Madrid. Tesis Doctoral. Madrid.
Serengeti Resources. 2017. Kwanika Project, https:// www.serengetiresources.com
Southern Copper. http://www.southerncoppercorp.com
Tematicas. 2018. https://tematicas.org/
US Department of Commerce Bureau of Labor Statistics. Wood Mckenze. https://www.bls.gov/
Wellmer F.W. and Drobe M. 2018. Quick Estimation of Economics of Exploration Projects--Rules-of-Thumb of Mine Capacity Revisited-the Input for Estimating Capital and Operating Costs. En este númeo BGM. https://doi.org/10.21701/bolgeomin.130.1.001
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2024 Consejo Superior de Investigaciones Científicas (CSIC)

This work is licensed under a Creative Commons Attribution 4.0 International License.
© CSIC. Manuscripts published in both the print and online versions of this journal are the property of the Consejo Superior de Investigaciones Científicas, and quoting this source is a requirement for any partial or full reproduction.
All contents of this electronic edition, except where otherwise noted, are distributed under a Creative Commons Attribution 4.0 International (CC BY 4.0) licence. You may read the basic information and the legal text of the licence. The indication of the CC BY 4.0 licence must be expressly stated in this way when necessary.
Self-archiving in repositories, personal webpages or similar, of any version other than the final version of the work produced by the publisher, is not allowed.